Power Generation & Distribution
Khartoum North phase II
The project featuring: -
-
Two 67 Kg /sec oil fired boilers operating
at 87 bars 510 deg. C.
-
Two 60 MW condensing steam turbine
generators.
-
Substation
-
Associated electrical plant.
-
Control and instrumentation.
This project now, commissioned and providing
the main thermal power supply on the National Grid.
 |
 |
|
Khartoum North Substation |
Khartoum North Power Station |
Top
Merowe Dam Project
TEC is a sub
consultant to Mott Macdonald in the Sudan. Mott MacDonald is awarded a
contract by Merowe Dam Project Implementation Unit, which consists of
preparation of revised tender documents for the implementation of Merowe Dam.
Mott MacDonald award TEC a sub consultancy contract to carry out the under
mentioned detailed works.
Contract 1 –
Infrastructure Works
A- Road from Karima to Merowe dam: complete re-design and preparation of
tender documents, including survey & Geotechnical investigation. A tender
design report shall be prepared prior to tender documents.
B- Township: determination of location of township, revised layout to take
account of larger plot sizes now required (including the use of the services
of a town planner) review and redesign of houses, addition of power, water and
sewage disposal services, preparation of tender document. Town layout and
design must reflect modern international experiences and house design to
respond to local traditions. Tender documents to cover full size of the
township, but with phased construction.
C- Rail trans-shipment facility at Karima: preparation of tender design &
tender documents and provide for a gantry crane of suitable capacity for
loading and offloading.
D- Power supply to township- included in township tender document
E- Water supply and waste water treatment – included in township tender
documents

Merowe Township |
Top
Hydro & Civil
The Water Work and Boreholes for the
National Urban Water Corporation.
-
The
Supervision of erection of most of the water work and boreholes for the
National Urban Water Corporation.
-
Supervision
and administration of construction of all new water works and extensions for
existing water facilities such as Khartoum North New Water Works:
Phase II.
Capacity 36,000 cu.m/day
.
Phase III,
Capacity 56,000 cu.m./day.
Top |
The
Design and Construction Building of Al Sayed flourmills-complex
|
 |
The Design of a 5-storey building flourmill plant, the scope of work has
included detail design, production of construction drawings, site
construction and management, and liasing with a Chinese main plants
supplier; the project has finished in time and to the satisfaction of the
client. The project
cost is 1.5 Million US$. |
Top
Al
kawther Hotel
 |
Al
Kawther hotel is a three stars hotel located by the river Nile in
Shendi-Sudan.The hotel comprise of 5 story main building.
TEC
role include-
-
Detail design of the building
-
Design
of the surrounding landscape
-
Design of electrical installation
-
Procurement of the construction material
-
Supervision
of skilled, semi skilled and unskilled labours.
-
Erection
of 1.0MW diesel generator.
|
Top
Port
Sudan SMA wheat silos
 |
The
engineering Circle has been developing a good relationship with the SMA
group one of the main importer/exporters of the grain in Sudan. The civil
department has been working as a design and build Engineer for SMA mainly
developing one of the biggest silos facility at Port Sudan.
The site consist of 16 silos 5000 Ton each. The engineering circle
was responsible for the Civil & Structural design, Construction,
Supervision of erection and commissioning.
|
Top
Red
sea flour mills complex 700 tons/day
 |
This
is the largest flourmill in terms of capacity in Sudan. It is located in Port Sudan in a reclaimed land from the Red
Sea. Buhler a Swiss company supplies the machines.
The complex comprises of:
-
Main machines building 48.0m high, multi-story
building eleven floors.
-
Wheat, Flour and bran bins, twenty concrete bins. The
total height of bins is 40.0m.
-
Flour warehouse. Total area is 4000 square meter.
-
Bran warehouse. Total area is 1000 square meter.
-
Powerhouse shed. Also include generator foundations,
3MW.
-
Concrete roads around the complex
|
Red Sea flour mills new extension 300
Tons/day
 |
Based on the success that TEC achieved in the Red sea flourmills, TEC
has been appointed as the turnkey contractor for the red sea flourmills
extension. The extension is
now under construction. TEC involvements are the same as in the first
stage.
|
Top
Planning & Studies
|
Private Jetty
The Engineering
Circle has been helping SMA with the last phase of developing Port Sudan
wheat and flour site, by providing assistance on the studies for the
private jetty for ships to load and unload. The jetty will handle
50,000MT Vessel.
The current
economical development in Sudan has been accompanied by a move to
industrial investment, The Engineering Circle has found its Engineering
expertise are very useful in the field of developing the industrial
plants, from the mid nineties The department has been expanding rapidly
using expatriates from the power generation and civil department. The
industrial department has been busy carrying out feasibility studies and
investigating the build of new industries. The department has been working
with reliable clients like SMA, Northern Soap Factories, Alsyed mills,
and others.
The industrial
department has been having especial attention from The Engineering Circle
board.
The industrial
department executive staff is a selection of ex-senior employees of NEC,
National Urban Water Corporation (NUWC), university lecturers and
Engineers who have been involved in the small industry in Sudan for many
years.
Top
Al Shiekh Mustafa Al amin
complex Port Sudan
Al Sheikh Mustafa Al
Amin Complex is located in Port Sudan. It is a complex of industrial
factories. The installation of electrical power in the complex. the total
installed power is 5.7 MW.
|
|